Product Detail :
|
Supply of 5310 MT of PP cement required for thermal power station (4x270 MW) dist. KTPS VII stage (1x800 MW) review engineering consultancy services for wet lime based flue gas desulphurisation system (FGD) of thermal power station, stage VII, dist.
|