Product Detail :
|
1 package balance work under providing comprehensive sewerage scheme to pallik aranai with collection system, pumping station, pumping main, allied electrical works and trench less technology for road and canal crossing works zone 1 to 4. * area ix -the following balance works under plugsing of sewage outfalls in chennai city water was in phase – 1. * enlargement of sewer main in dn. 111-package v. * laying of pumping main from north mylapore pumping station to advar pumping station in dn. 126 -package vi. * upplying, conveying, laying and jointing 200 mm dia di pipes for a length of 23 km. & 14 km for conveying 2 mld ttro water each from the existing sriperumbudur sipcot sez sump to the industry m/s. sojitz motherson industrial park, singadi vakkam village and m/s.ceat tyres ltd., kannanthangal village, kancheepuram district including construction of common pump house and its allied works inside the compound wall of existing sriperumbudur sipoot sez sump-cont. * supplying, laying jointing and commissioning of second row of 2000 mm dia nominal diameter ms welded pipes at different locations between chem berambakkam wtp and poonamalee bye pass road junction near saveetha dental college – cont.
|